We start by neatly saw-cutting the perimeters of your deteriorated asphalt at the specified depth.
We then excavate the deteriorated asphalt and any unsuitable subbase material and load the material onto waiting dump trucks.
The material is then hauled off site and recycled or properly disposed.
If there is existing stone base, we will then compact it to insure a solid foundation for the rest of the repair process.
A tack coat is then applied to the edges of the perimeters.
The next step involves the placement and compaction process. This is done by installing hot asphalt mix in two lifts (or layers) to the specified depth.
We finish it off by following rigid compaction guidelines to control compacted air voids so that air and moisture will not permeate the pavement which can reduce its durability. It can also provide inadequate expansion which will make it unstable. We then use either a vibratory plate and/or multi-ton vibratory roller during the compaction process.